Classification of the project
According to the EU Taxonomy (Regulation 2020/852 of the EU and its attachments).
Financing investments for the production of solar energy for sale on the market, which are repaid by the cash flows generated by the specific projects.
According to the EU Taxonomy (Regulation 2020/852 of the EU and its attachments).
The credit will be structured according to the specific features of the particular project.
Financing:
Opportunity for project financing (without commitment to the operating business)
Realization of the project mainly through SPV.
Up to 10 years.
At least 30%.
Competitive pricing upon agreement.
Transparent financing conditions with the provision of a detailed offer and clear parameters at an early stage of the project implementation
The repayment of the loan is linked to the cash flows generated by the project. Possibility for balloon payment.
Mortgage on the adjacent land and a pledge of commercial enterprise with individualization of assets.
Specific requirements (including but not limited to):
Mortgage on the land with issued construction permission(-s) according to the project parameters; pledges/assignments and directed cash flow of the receivables from the projects.
Market valuation and asset insurance required.
Statement and Agreement for connection to the electricity transmission and distribution networks.
Engineering, procurement, and construction contract (EPC Contract).
Solar report and estimated production quantities, prepared according to the project parameters and specific choice of technology.
Operation and management (O&M) contract.
Estimated cash flows for the term of financing – investor’s valuation model.
EWRC (Energy and water regulation commission) electricity production license (for capacities over 5MW).
RIEW decision for assessment of the need for EIA or Environmental assessment for the project and/or the adjacent infrastructure.
Technical project for construction according to the Spatial Development Act and implementation of the administrative procedures according to Regulation №6 for connection of producers and customers of electricity to the transmission and distribution networks.